毛片精品麻豆久久久,欧美日本在线免费观看网站,亚洲最新av一区二区不卡,久久久久久久久久久一区二区三区

公告:自動售酒機
白酒運輸罐的充水實驗應該注意什么?

發(fā)布于:2021-02-26 15:55:19  來源:http://www.88l9.cn

,設備在充水過程中充水到設計高液位下1m時進行固定頂部強度及嚴密性試壓,關(guān)閉透光孔,同時安裝U型壓差計,邊充水增壓,當U型計正壓到設計要求水柱時,用肥皂水檢查罐壁頂每條焊縫,升壓不能超過設計要求水柱,如不滿且罐頂無異常變形為合格,然后打開透光孔,繼續(xù)充水,到罐體設計液位,臺罐充水淺驗合格后,連接好第二臺充水管線,將水排放到第二臺儲罐,固定頂?shù)姆€(wěn)定性試驗應充水到設計液壓,用防水方法進行,此時壓差做負壓試驗,一面排水緩慢降壓到設計要求水柱時,恢復常壓。
First of all, when the equipment is filled with water to 1m below the designed high liquid level, the fixed top strength and tightness pressure test shall be carried out, the light transmission hole shall be closed, and the U-shaped differential pressure gauge shall be installed at the same time. When the U-shaped differential pressure gauge is pressurized to the design required water column, soapy water shall be used to check each welding seam on the top of the tank wall, and the pressure rise shall not exceed the design required water column. If it is not satisfied and there is no abnormal deformation on the tank top, it is qualified, and then Open the transparent hole and continue to fill water until the designed maximum liquid level of the tank is reached. After the water filling of the first tank is qualified, connect the water filling pipeline of the second tank and discharge the water to the second tank. The stability test of the fixed roof should be filled to the designed maximum hydraulic pressure and carried out by the waterproof method. At this time, the negative pressure test should be carried out for the differential pressure. When one side of the tank drains slowly and depressurizes to the designed water column, the normal pressure should be restored.
其次,每天上下午都要從進氣孔鋼梯下去,檢查浮量升降情況,同時檢查打磨罐壁及飛濺渣,保護好浮盤密封板皮帶,同時打磨出晚上充水高的余量。在充水和排水時進行罐內(nèi)浮盤升降的檢查。停止充水觀察48小時檢查基礎(chǔ)周圍與地平面有沒裂縫及下沉的痕跡,白酒運輸罐從罐頂東西面南北方向放線錘。沖水過程中要檢查罐壁底板是否有漏水的痕跡,如有發(fā)現(xiàn)及時排水處理。
Secondly, every morning and afternoon, we should go down from the steel ladder at the air inlet to check the fluctuation of the floating capacity. At the same time, we should check and polish the tank wall and splashing slag, protect the belt of the sealing plate of the floating plate, and polish the margin of the water filling height at night. During water filling and drainage, check the lifting of floating plate in the tank. Stop filling for 48 hours and check the cracks around the foundation and ground floor. The Baijiu can be used from the top of the tank to the north and south direction of the tank. In the process of flushing, it is necessary to check whether there is any trace of water leakage on the tank wall and bottom plate, and timely drain if any.
不銹鋼內(nèi)膽實木酒桶
,在做實驗的時候,也要注意酒罐在施工時的措施。嚴禁攜帶香煙及火種進入施工現(xiàn)場。罐吊施工中,指揮的聯(lián)絡系統(tǒng)必須可靠,牢固,嚴格控制吊升速度,防止事故發(fā)生。庫內(nèi)施工必須嚴格遵守相關(guān)防火制度,及時辦理動火批準手續(xù),在指定的區(qū)域范圍內(nèi)動火,下班前不必須關(guān)掉施工用具電源,熄滅一切火種。
Finally, when doing the experiment, we should also pay attention to the safety measures in the construction of wine tank. It is strictly forbidden to bring cigarettes and kindling into the construction site. During the construction of the tank crane, the command liaison system must be safe, reliable and firm, and the hoisting speed must be strictly controlled to prevent accidents. The construction in the warehouse must strictly abide by the relevant fire prevention system, timely handle the fire approval procedures, carry out the fire in the designated area, and do not have to turn off the power supply of construction tools and extinguish all kinds of fire before work.
加強自身保護,高空作業(yè)前必須檢查一下腳手架搭設是否可靠,梯子是否有防滑措施,跳板是否會跳頭等關(guān)鍵部位。不銹鋼罐進行正壓試驗時,應嚴密觀察U型壓力計,驗收合格應立即使罐體與大氣相通,恢復正常。各種用電設備,手持電動工具及罐體必須接地可靠,并裝有漏電保護器,各種電線電纜絕緣良好,而且要經(jīng)常檢查是否有外傷損壞絕緣,及時處理。在施工區(qū)域內(nèi)備足滅火器及有關(guān)的的防火器材,確保施工用火。
Strengthen self-protection. Before working at height, you must check whether the scaffold is safe and reliable, whether the ladder has anti-skid measures, whether the springboard will jump and other key parts. During the positive pressure test of stainless steel tank, the U-type pressure gauge should be closely observed, and the tank body should be connected with the atmosphere immediately after the acceptance. All kinds of electric equipment, hand-held electric tools and tanks must be grounded reliably and equipped with leakage protector. All kinds of wires and cables must be well insulated. Besides, it is necessary to check whether there is any damage to the insulation and deal with it in time. Sufficient fire extinguishers and related fire prevention equipment shall be prepared in the construction area to ensure the construction safety.

咨詢熱線:
0537-4556677

平陆县| 敦煌市| 桦南县| 金坛市| 安龙县| 抚州市| 金阳县| 大姚县| 博罗县| 三都| 吉隆县| 黑龙江省| 宜宾县| 郎溪县| 鹤壁市| 安徽省| 永福县| 玉溪市| 安福县| 海南省| 南丰县| 梁山县| 宁南县| 海南省| 丹凤县| 丹阳市| 布拖县| 喀什市| 苍梧县| 玉山县| 城固县| 徐汇区| 朝阳县| 临沂市| 雷州市| 安溪县| 满洲里市| 边坝县| 寿宁县| 靖西县| 家居|